Where does this market start and stop?
On-site power gets mixed up with grid supply and with power bought from plants far away, so we start by drawing a clear line.
A gas plant built next to a campus and wired straight to it is in, and so are fuel cells, engines and solar placed on the site. Power bought from a distant nuclear plant through the grid is out, and so is the cooling equipment that uses that power.
That way, every number in the report measures power made where the computers are.











